chore(otter): changes before the 2026-10-02 sync - #14
Merged
Merged
Conversation
The repository moved from acme-acme-acme to otterware-app. npm provenance rejects packages whose repository.url does not match the publishing repo. Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Laurin-Notemann
added a commit
that referenced
this pull request
Oct 3, 2026
* chore(otter): point release and source links at otterware-app/otter-code Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com> Otter-Sync: 2026-10-02
Laurin-Notemann
added a commit
that referenced
this pull request
Oct 3, 2026
* chore(otter): point release and source links at otterware-app/otter-code Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com> Otter-Sync: 2026-10-02
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Everything committed to
mainsince the last sync, moved onto the rebuiltmainso it lands as one squash commit. The rebuiltmainis upstream PR pingdotgg#2829 at66a91077f, plus the kept Otter Code commits, the 2026-09-25, 2026-09-26, 2026-09-27, and 2026-09-29 sync squashes, and a regenerated adapt commit. PR pingdotgg#2829 is still open, so upstream is its head.Commits:
The 30 new upstream commits needed these conflict resolutions in the kept commits:
expo-widgetsconfig, so the fork's edits to those deleted files are gone. The widget descriptions inapp.config.tstake upstream's new iOS/Android split and still say Otter Code. The Live Activity placeholder takes upstream's new stale-date argument and keeps the "Otter Code" title.mobile-showcase.tskeeps the Otter package and scheme next to upstream's new dev-client launch flags.build_marketinganddeploy_marketing(perf(release): build Vercel deployments early and go live after publish pingdotgg/t3code#14029). Both keep thepingdotgg/t3code-only gate.@vscode/l10nlicense entry sits next to upstream's newnoxcturnalentries.The regenerated adapt commit picks up upstream's new release jobs (Ubuntu runners in place of Blacksmith). Upstream added no relay migrations.
Aligning with upstream: none of the 30 upstream commits (OpenCode 2, Pi 1.0, project from a name, restart session, hotkey recording, release pipeline perf) overlaps a fork feature (diff panel, code intelligence, Linear, Otter release links). No
acme-acme-acmereferences remain. Only the marketing site, which the fork never deploys, still links to pingdotgg releases.Verified:
🤖 Generated with Claude Code