Skip to content

8383914: [PPC] cleanup dtrace leftovers#31057

Closed
dbriemann wants to merge 1 commit intoopenjdk:masterfrom
dbriemann:dlb/ppc_dtrace_cleanup
Closed

8383914: [PPC] cleanup dtrace leftovers#31057
dbriemann wants to merge 1 commit intoopenjdk:masterfrom
dbriemann:dlb/ppc_dtrace_cleanup

Conversation

@dbriemann
Copy link
Copy Markdown
Member

@dbriemann dbriemann commented May 6, 2026

Removes a test from the problemlist.txt and removes unused PPC code regarding dtrace. Dtrace support is excluded from Power builds.



Progress

  • Change must be properly reviewed (1 review required, with at least 1 Reviewer)
  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue

Issue

  • JDK-8383914: [PPC] cleanup dtrace leftovers (Enhancement - P4)

Reviewers

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk.git pull/31057/head:pull/31057
$ git checkout pull/31057

Update a local copy of the PR:
$ git checkout pull/31057
$ git pull https://git.openjdk.org/jdk.git pull/31057/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 31057

View PR using the GUI difftool:
$ git pr show -t 31057

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk/pull/31057.diff

Using Webrev

Link to Webrev Comment

@bridgekeeper
Copy link
Copy Markdown

bridgekeeper Bot commented May 6, 2026

👋 Welcome back dbriemann! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link
Copy Markdown

openjdk Bot commented May 6, 2026

@dbriemann This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8383914: [PPC] cleanup dtrace leftovers

Reviewed-by: mdoerr

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been 42 new commits pushed to the master branch:

As there are no conflicts, your changes will automatically be rebased on top of these commits when integrating. If you prefer to avoid this automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

Copy link
Copy Markdown
Contributor

@TheRealMDoerr TheRealMDoerr left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Looks good and trivial. Thanks for cleaning this up!

@openjdk openjdk Bot added the hotspot hotspot-dev@openjdk.org label May 6, 2026
@openjdk
Copy link
Copy Markdown

openjdk Bot commented May 6, 2026

@dbriemann The following label will be automatically applied to this pull request:

  • hotspot

When this pull request is ready to be reviewed, an "RFR" email will be sent to the corresponding mailing list. If you would like to change these labels, use the /label pull request command.

@openjdk
Copy link
Copy Markdown

openjdk Bot commented May 6, 2026

The total number of required reviews for this PR has been set to 2 based on the presence of this label: hotspot. This can be overridden with the /reviewers command.

@openjdk openjdk Bot added the rfr Pull request is ready for review label May 6, 2026
@mlbridge
Copy link
Copy Markdown

mlbridge Bot commented May 6, 2026

Webrevs

@TheRealMDoerr
Copy link
Copy Markdown
Contributor

/reviewers 1

@openjdk
Copy link
Copy Markdown

openjdk Bot commented May 6, 2026

@TheRealMDoerr
The total number of required reviews for this PR (including the jcheck configuration and the last /reviewers command) is now set to 1 (with at least 1 Reviewer).

@openjdk openjdk Bot added the ready Pull request is ready to be integrated label May 6, 2026
@dbriemann
Copy link
Copy Markdown
Member Author

Thanks for your review!
/integrate

@openjdk
Copy link
Copy Markdown

openjdk Bot commented May 7, 2026

Going to push as commit c5b9e4d.
Since your change was applied there have been 50 commits pushed to the master branch:

Your commit was automatically rebased without conflicts.

@openjdk openjdk Bot added the integrated Pull request has been integrated label May 7, 2026
@openjdk openjdk Bot closed this May 7, 2026
@openjdk openjdk Bot removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels May 7, 2026
@openjdk
Copy link
Copy Markdown

openjdk Bot commented May 7, 2026

@dbriemann Pushed as commit c5b9e4d.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

@dbriemann dbriemann deleted the dlb/ppc_dtrace_cleanup branch May 7, 2026 10:16
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

hotspot hotspot-dev@openjdk.org integrated Pull request has been integrated

Development

Successfully merging this pull request may close these issues.

2 participants