Skip to content
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
5 changes: 5 additions & 0 deletions docs/topics/ladder-climb-roadmap/PLAN.md
Original file line number Diff line number Diff line change
Expand Up @@ -154,6 +154,11 @@ ADR-0002-guarded ordering, three repos, ownership seams respected:
> required check. Full rationale + evidence: ADR 0002 "ordering correction" addendum. Ruleset
> flip stays LAST (unchanged). Step 0 ran as written: sole consumer = this repo's caller;
> captured context `security-review / security-review`.
>
> Status (2026-07-21): steps 1–2 LANDED — ci-workflows#189 (reusable always-report shape,
> pin `99cb082`), standards#229 + sync #827 (reviewed runner-input contract for the new pin),
> #825 (this caller adopts `paths`, context verified unchanged live). Remaining: docs-only
> skip-path verification PR, then step 3 (github-iac required check) behind its user gate.

0. Pre-flight consumer check (FIRST work item): enumerate every consumer of the ci-workflows
reusable security workflow before reshaping it — org-wide
Expand Down
Loading