You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Release workflow fails if dispatched before exact-SHA CI / Packed install finish #332
What happened
The 0.2.45 Release run 40591839135 was dispatched at 2026-10-27T22:03:50Z, ~14s after the #331 merge push to main. CI on a7ff3b6 took 1h49m and Packed install lifecycle 44m, so the "Exact-head CI conclusions" step read CI=none packed-install=none and release verify failed closed:
release verify: NOT READY — 2 blocker(s):
- packed-install-lifecycle is missing
- platform-ci is missing
v0.2.45 stayed unpublished for ~2 days. Re-dispatching the same version/sha on 2026-10-29 (run 40884307777) passed (release verify: READY) and published v0.2.45.
Suggestion
Either have the exact-head step wait/poll (with a timeout) while CI / Packed install are in_progress, or have the release docs/train say to dispatch only after both are green on the main SHA. Fail-closed behavior itself is correct; the failure mode is just silent until someone checks.
Activity