Skip to content

Release workflow fails if dispatched before exact-SHA CI / Packed install finish #332

Open

Description

@lidge-jun

What happened
The 0.2.45 Release run 40591839135 was dispatched at 2026-10-27T22:03:50Z, ~14s after the #331 merge push to main. CI on a7ff3b6 took 1h49m and Packed install lifecycle 44m, so the "Exact-head CI conclusions" step read CI=none packed-install=none and release verify failed closed:

release verify: NOT READY — 2 blocker(s):
  - packed-install-lifecycle is missing
  - platform-ci is missing

v0.2.45 stayed unpublished for ~2 days. Re-dispatching the same version/sha on 2026-10-29 (run 40884307777) passed (release verify: READY) and published v0.2.45.

Suggestion
Either have the exact-head step wait/poll (with a timeout) while CI / Packed install are in_progress, or have the release docs/train say to dispatch only after both are green on the main SHA. Fail-closed behavior itself is correct; the failure mode is just silent until someone checks.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions