Skip to content

Reference the goalpost when opening release PRs #804

Description

@flyingrobots

Problem

The v19.0.0 release PR was opened without its completed release-goalpost issue reference. The required PR Issue Reference check failed until the PR body was manually updated with Related: #758; no code change was needed.

Acceptance criteria

  • The release runbook or release-PR helper requires the exact same-repository goalpost issue number.
  • The generated release PR body includes that reference before CI starts.
  • A local or unit-level check exercises the same accepted reference forms as the hosted policy.
  • Ordinary non-release PR behavior is unchanged.

Metadata

Metadata

Assignees

No one assigned

    Labels

    area:releasePrimary work area: release.priority:laterDeferred or speculative work.priority:nextNext in line after active work.status:availableOpen and available for prioritization; not blocked or actively in progress.type:debtDebt, rot, or structural risk.type:releaseRelease operation or release gate work.

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions