Repository navigation
docs(skills): analog loop lessons of ticks 9 and 70-84 (Closes #12516) - #12517
Conversation
Five new dated lessons in analog-emulation (the shape gate wants numbered requirements, one red job can hide a second and a new workflow file needs a census re-bless, deferred accepted entries, gate durations, the merge basis comment) and four lines that sat uncommitted in an earlier session tree (two per skill). Prose only: two skill files, +9 lines. Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
Summary by t27-beesAdds seven dated operational lessons to two skill files, capturing hard-won knowledge from recent analog-emulation ticks (issue-shape gate requirements, hidden red jobs, deferred accepted entries, gate duration budgets, merge-basis comments) and two Mac-specific traps in t27os-orchestra (recursive find/grep timeouts, t27b/t27c test value extraction). These are purely additive documentation changes for future reference. Worth a lookNothing stood out. Read: 2 files, +9 -0, the whole diff. Head |
PR DashboardGenerated at: 2026-10-25 18:03:11 UTC
Summary
Seal Status
|
|
Merge basis (hand-merge under the rule of 2026-10-25 16:50, owner veto default from 2026-10-26 12:00 +07), head 00a1c1a (master dc98d95 is already in it):
🤖 Addressed by Claude Code |
Summary
.claude/skills/analog-emulation/SKILL.md: the issue-shape gate wants numberedFR-001: ... MUST ...requirements; one red job can hide a second (cli-tri: the now-gate test, then the census pin after a new workflow file); deferred accepted entries; gate durations at--jobs 2 --timeout 45; the merge-basis comment before a hand merge.t27os-orchestra).Closes #12516
Refs #10486
🤖 Generated with Claude Code