Problem
Reducing the manual-review surface toward the 97% automation target must not outpace the evidence. The auto-loosening machinery (visible + held-out split clearance, hard floors, flag gates) exists; this issue is the next planned tranche run through it.
Scope
- Enumerate the current manual-review trigger paths with volumes (from the ledger) — which categories contribute most manual load
- For the top candidates, run the standard backtest clearance; loosen only what clears both splits; record corpus checksums + SHAs per run
- Explicitly out: visual-change PRs remain held for human review
Acceptance
Each loosened path has a linked backtest record; automation-rate series (sibling issue) reflects the change; no loosening without clearance.
Problem
Reducing the manual-review surface toward the 97% automation target must not outpace the evidence. The auto-loosening machinery (visible + held-out split clearance, hard floors, flag gates) exists; this issue is the next planned tranche run through it.
Scope
Acceptance
Each loosened path has a linked backtest record; automation-rate series (sibling issue) reflects the change; no loosening without clearance.