docs: insert Phase 70.1 for rotation read-plane durability#597
Conversation
Deferred rotation read-plane debt from Phase 70 ship (PR #596 review): depth>=2 crash-resume soundness gap, floor-store write-failure propagation + cross-store atomicity, and the reconcile cached-generation gate. Retargets the depth-gap todo (resolves_phase 70.1) and folds hardening-followups items 1 + 5 into the phase. Depends on Phase 70. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com> Entire-Checkpoint: b65e7c88bc74
|
Caution Review failedThe pull request is closed. ℹ️ Recent review info⚙️ Run configurationConfiguration used: Path: .coderabbit.yaml Review profile: CHILL Plan: Pro Run ID: 📒 Files selected for processing (5)
WalkthroughThis PR adds planning documentation for a new Phase 70.1, addressing rotation read-plane durability and deep crash-resume soundness gaps found in PR ChangesPlanning documentation updates
Estimated code review effort: 1 (Trivial) | ~5 minutes Possibly related PRs
✨ Finishing Touches🧪 Generate unit tests (beta)
Warning Tools execution failed with the following error: Failed to run tools: 13 INTERNAL: Received RST_STREAM with code 2 (Internal server error) Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
Release PreviewNo version bumps detected. All changes are in unversioned paths or use exempt commit types. |
Greptile SummaryThis PR inserts a new planning phase for rotation read-plane durability.
Confidence Score: 5/5This looks safe to merge.
Important Files Changed
Reviews (1): Last reviewed commit: "docs(roadmap): insert Phase 70.1 for rot..." | Re-trigger Greptile |
Insert Phase 70.1 — Rotation Read-Plane Durability and Deep Crash-Resume Soundness
Planning-only change (
.planning/docs). Inserts a decimal phase between 70 and 71 to close the rotation read-plane debt disclosed at Phase 70 ship (PR#596review) — it doesn't fit Phase 71 (API/share-invite), 72 (write plane), or 73 (web), and mirrors the 68.1/68.2 decimal-phase precedent.Scope (3 workstreams)
2026-07-08-rotation-crash-resume-depth2-soundness-gap.md.HighWaterStore::put/bump_floor(CodeRabbit T4) + cross-store bump atomicity (hardening item 1).Gate: a new depth-2/3 mid-walk-crash case in
rotation-crash-safety.test.ts.Bookkeeping
resolves_phase: 70.1).rotation-hardening-followupstodo annotated — items 1 + 5 folded into 70.1; items 2/3/4/6 already closed by Phase 70. Left without an auto-close marker (only 2 of 6 items remain).total_phases15 -> 16, current position -> 70.1. The derived progress counters (completed/percent) were already stale onmainfrom the Phase 70 merge and will reconcile on the next GSD state write.🤖 Generated with Claude Code
Summary by CodeRabbit