Skip to content

docs: reconcile dated continuous acceptance evidence - #781

Merged
mergify[bot] merged 1 commit into
mainfrom
codex/matrix-reconcile
Oct 9, 2026
Merged

mergify[bot] merged 1 commit into
mainfrom
codex/matrix-reconcile

Conversation

@Cuarroc

@Cuarroc Cuarroc commented Oct 9, 2026 •

Copy link
Copy Markdown
Owner

Die Abnahmematrix unterscheidet jetzt vier belegte Zeilen von 23 Zeilen mit konkreten Restbedingungen.
Jede Zeile nennt datierte Quellen, damit Tests, frühere PC-Belege und noch fehlende Abnahmen nachvollziehbar bleiben.
Der Dauerbetrieb bleibt ausgeschaltet; aus diesem Dokument entsteht keine neue Freigabe oder Nutzeraufgabe.

Report

Package / operator / tier: MATRIX-RECONCILE / PFLEGEN / C.
Authority / parent / ticket / owner: Root dispatch dated 2026-10-09; TEMPO-KERN Ready-Queue refill; ticket 258d2a57; srv-matrix-reconcile.
Goal: reconcile all 27 acceptance rows with dated evidence without inventing passes or changing acceptance requirements.
Native evidence: get_goal returned goal: null; create_goal returned an active bounded MATRIX-RECONCILE goal covering this file, full prepush, verified push and draft-PR handover. Parent acceptance is separate.
Base: a1d9a5fba38d2e50fe72727a644cb587edbe9357, fetched at start; git merge-base --is-ancestor dd7391cd064a0720b2d1f747e959bbeab5a3fe7d origin/main exited 0. Existing assigned branch already matched fetched origin/main.
Candidate: 78f0f4cdc841f8ab06ceebf78ebda723ff037107.
Scope / overlap: only .pa/continuous_acceptance_matrix.md; 41 additions + 27 deletions = 68 diff lines, below 120. BUGS.md remains owned by docs-sync #764. No runtime, dependency, license, seam or architecture-allowlist changes.
Red-first: No-Test: documentation only (acceptance matrix reconcile).

What changed and evidence for every row

The original requirement, required-proof and proof-type cells remain byte-for-byte unchanged. The dated introduction distinguishes historical evidence from a new runtime measurement. PR reports and merge metadata were checked against origin/main and the W4-02/M4/current Z4/decision rows in PLAN. The old evidence ledger is explicitly historical. Backup and singleton passes are retained as partial evidence; the specific missing artifacts are named rather than inferred.

Row Disposition / remaining gate Evidence source
1 Open: installed-app runtime audit PR #315 (2026-10-04), #481 (2026-10-05): audit/config tests and locked activation
2 Open: durable user decision and policy revision PR #481 (2026-10-05); PLAN E21 still open
3 Open: verdict-bound resume or explicit scope decision PR #453 (2026-10-05) only proves resume refusals; PLAN E18
4 Open: integrated project boundary and atomic write authorization PR #405 (2026-10-05), PLAN Z4-M4B-0 through 4 and M4 blocker
5 Open: competing claims/fences with real worker processes PR #412 (2026-10-05): fake-adapter concurrency and stale-write refusal
6 Open: integrated dispatcher controls, restart and real sessions PR #440 (2026-10-05): Store controls and legacy-queue isolation only
7 Open: positive end-to-end dispatch with accepted provider/scheduler gates PR #340 (2026-10-04), #412 (2026-10-05): test permit and negative matrix
8 Open: integrated claim/launch authorization without bypass PR #431/#443 (2026-10-05): claim fix and fake-dispatcher refusals; PLAN Z4-M4B-3
9 Open: dependency cases with a real worker process PR #412 (2026-10-05): satisfied/open/missing/foreign/truncated cases with fake adapter
10 Open: real RAM/capacity drill PR #500 (2026-10-05) explicitly excludes it; PLAN Z4-W303-PC-REST
11 Open: observed execution identity for each authorized adapter PR #500 (2026-10-05): basic workers lack HQ runs; PLAN Z4-W303-PC-REST
12 Open: sourced, dated provider collector/usage evidence PR #500 (2026-10-05), PLAN HQ2-05b remains open
13 Open: real crash, normal exit and lost-response reconciliation PR #443 (2026-10-05): fake-adapter reconciling refusal only
14 Fulfilled at the cited test scope PR #365 (2026-10-04), merge 9f75ac3: HTTP/Store, fake child abort/resume, checkpoint replay and stale refusal
15 Fulfilled at the narrowed HTTP/Store scope PR #360 (2026-10-04), merge 81e58c0: commit/run binding, isolation, foreign/stale refusal and frozen policy
16 Open: independent candidate-bound review and rejected self/unverified review PLAN E22 open as inspected 2026-10-09; W5-02d remains after M4
17 Fulfilled at the narrowed HTTP/Store scope PR #374 (2026-10-04), merge bfc88c4: persistent A-to-B invalidation, replay, stale refusal; approvalEligible stays false
18 Open: delivery-chain PR with run ID, review disposition and protection proof PR #408/#448 (2026-10-05): audit and Continuous integration refusal; PLAN E20
19 Open: uninterrupted planning audit coverage across write/audit boundary PR #358 (2026-10-04), #408/#423/#444 (2026-10-05); #44 (2026-10-02) proves UPDATE/DELETE guards; #444 explicitly retains a crash window
20 Fulfilled for the historical installed-app drill only PR #500 (2026-10-05), merge f0693a3: installed v1.5.0 ec58a1c, empty inventory after 961 ms
21 Open: installed-PC recovery at every critical transition PR #456 (2026-10-05) Store kill points; #500 excludes PC crash drill; PLAN Z4-W303-PC-REST
22 Open: referenced snapshot/restore/integrity manifest including WAL and maintenance PR #500 (2026-10-05) records the backup pass; detailed artifacts are not in that report
23 Open: installed success/cancel/fail updater drills and signed relaunch PR #500 (2026-10-05), PLAN W3-07; merged W3-02 kits do not prove the installed run
24 Open: five approved benchmark runs with all metrics and run/evidence bindings PR #73 (2026-10-03): W4-01 tooling, no complete measurement report
25 Open: individual multistart/recovery/session-preservation artifacts PR #500 (2026-10-05) records the singleton pass without the individual manifests
26 Open: complete candidate-bound cross-platform acceptance PR #48 (2026-10-02), PLAN W4-02: matrix definition, not overall acceptance
27 Open: user-authored committed attestation and matching release audit PR #398 (2026-10-04): verifier only; PLAN E20 inspected 2026-10-09

Evidence

Command / observation Exit code / result
git fetch origin and base ancestry check above 0
git log origin/main with package/continuous/audit/drill filters 0
gh pr list --state merged --search <id> for M4, drill, M4-R8, unassigned, W4-01 and W5-05; gh pr view for detailed proof reports 0
bash scripts/ci/gates.sh lane prepush in the assigned worktree with the final matrix content 0; 22 gates, 268 s; Rust: 1,892 passed, 7 skipped
Inline Python document invariant check: 27 rows, unchanged acceptance cells, 4 fulfilled, 23 explicit open gates, date in every status 0
git diff --check 0
bash scripts/ci/secret-scan.sh after staging 0; no leaks
git commit with required No-Test trailer, including precommit hook 0
git push -u origin codex/matrix-reconcile with full prepush hook at candidate 78f0f4c 0; 22 gates, 137 s; Rust: 1,892 passed, 7 skipped
git ls-remote origin refs/heads/codex/matrix-reconcile 0; remote equals 78f0f4cdc841f8ab06ceebf78ebda723ff037107

NICHT ABGEDECKT

  • Linux does not compile or execute #[cfg(windows)] tests or Windows clippy arms; the Windows lane runs in the merge queue.
  • Browser smoke, frontend build and workflow gates are outside prepush; external updater/mirror services were not exercised.
  • No new installed-app run, provider probe, PC drill, benchmark, user attestation or release acceptance was performed. Historical evidence is not a current-head runtime certification. Four fulfilled rows do not make M4 complete.
  • The local lage-jetzt mirror and a memory tool were unavailable; live git/PR sources and PLAN were used. Start check verified RAM/build capacity before prepush; no usage file or runtime-model observation was available.

Reviews and disposition

Review: ausstehend (Stufe C); pending Root dispatch. No external review or review bot was started by this worker. Tier C needs no external review under AGENTS.md; readiness/integration remains the orchestrator's decision.

Open points / handover

  • Documentation implemented and locally tested; draft PR only, not accepted or merged.
  • The 23 remaining gates are listed individually above and in the matrix. Continuous Mode remains disabled and frozen until M4.
  • Next owner: Root/orchestrator for dispatch disposition and integration. No ready flag, labels or queue action requested by this worker.

Root-Abnahme (09.10.2026, head 78f0f4c)

Tier C — docs only (.pa/continuous_acceptance_matrix.md); rows reconciled with dated evidence, no invented passes (KI-sweep row B:63). Gates suffice, no external review required; worker evidence: own gates.sh lane prepush exit 0 and push verified with git ls-remote (see Report).

NICHT ABGEDECKT addendum: Windows lane comes from the merge queue.

No-Test: documentation only (acceptance matrix reconcile)
@Cuarroc
Cuarroc marked this pull request as ready for review October 9, 2026 00:48
@Cuarroc Cuarroc added the review-ok Pipeline: review disposition complete, no open high finding label Oct 9, 2026
@chatgpt-codex-connector

chatgpt-codex-connector Bot commented Oct 9, 2026 •

Copy link
Copy Markdown

Codex Review Summary

This comment shows the latest Codex review activity on this pull request.

Review Status Commit Review trigger
📝 Code Review ✅ Completed 2026-10-09T00:50:27.341483Z 78f0f4c Draft marked ready
ℹ️ About Codex in GitHub

Your team has set up Codex to review pull requests in this repo. Reviews are triggered when you

  • Open a pull request for review
  • Mark a draft as ready
  • Comment "@codex review" or "@codex security review".

Codex reacts with 👀 while any review is running, comments if it has suggestions, and reacts with 👍 once all reviews finish with no findings.

@mergify mergify Bot added the queued label Oct 9, 2026
@mergify
mergify Bot merged commit e74b1d4 into main Oct 9, 2026
17 checks passed
@mergify

mergify Bot commented Oct 9, 2026

Copy link
Copy Markdown
Contributor

Merge Queue Status

This pull request spent 19 minutes 58 seconds in the queue, including 14 minutes 11 seconds running CI.

Required conditions to merge

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

review-ok Pipeline: review disposition complete, no open high finding

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant