Skip to content

ci: cut the weekly rc branch on Monday 3am PT instead of Friday - #49472

Merged
yuneng-berri merged 1 commit into
mainfrom
litellm_ci_028866
Oct 31, 2026
Merged

yuneng-berri merged 1 commit into
mainfrom
litellm_ci_028866

Conversation

@yuneng-berri

Copy link
Copy Markdown
Contributor

Moves the weekly rc branch cut from Friday 3am Pacific to Monday 3am Pacific. Only the schedule changes, the job that reads the version and creates the branch is untouched, and manual dispatch still works the same way

Details

TLDR

Problem this solves:

  • The rc branch is cut on Friday, we want it cut on Monday

How it solves it:

  • Change the create-rc-branch.yml cron weekday from 5 to 1, keeping 3am America/Los_Angeles

Pre-Submission checklist

Please complete all items before asking a LiteLLM maintainer to review your PR

  • I have added meaningful tests
  • The handful of test files covering my change pass locally, e.g. uv run pytest tests/unit/<your_test_file>.py -v. Leave the suites (make test-unit-*, make test-unit) to CI: it finishes in ~15 minutes where a laptop takes an hour or more
  • My PR passes all required CI/CD checks (e.g., lint, schema.d.ts sync check, etc.)
  • My PR's scope is as isolated as possible; it only solves 1 specific problem
  • Every automated review on my PR's latest commit has finished, and I have addressed or replied to each of its findings before requesting a maintainer review

Delays in PR merge?

If you're seeing a delay in your PR being merged, ping the LiteLLM Team on Slack (#pr-review).

Screenshots / Proof of Fix

E2E exception at 9b46661. The diff is one character in the cron weekday field and the job body is unchanged. A scheduled trigger cannot be fired early, and dispatching the workflow would cut a real rc branch, so it was not run

The existing schedule already honors the timezone key. The last six scheduled runs started on Fridays between 10:13 and 10:21 UTC, which is 3am PDT plus normal GitHub queue delay, for example https://github.com/BerriAI/litellm/actions/runs/41039218612 on 2026-10-30. With weekday 1 the same entry fires Monday at 3am Pacific, which is 11:00 UTC once standard time starts on 2026-11-01

Type

🚄 Infrastructure

Caveats (if any)

Medium

  • The first Monday run uses whatever version main's pyproject.toml has
    • Still 1.109.0 means the run fails red with "rc/1.109.0 already exists" and changes nothing
    • Already bumped to 1.110.0 means rc/1.110.0 gets cut days after rc/1.109.0

Final Attestation

  • The tests check the right things, including the edge cases, and regressions in the respective real-world customer use-cases are not possible after this PR

@yuneng-berri
yuneng-berri requested a review from a team October 31, 2026 18:51
@codecov

codecov Bot commented Oct 31, 2026

Copy link
Copy Markdown

Codecov Report

✅ All modified and coverable lines are covered by tests.

📢 Thoughts on this report? Let us know!

@yuneng-berri
yuneng-berri enabled auto-merge (squash) October 31, 2026 19:32
@yuneng-berri
yuneng-berri merged commit 3129e44 into main Oct 31, 2026
87 checks passed
@yuneng-berri
yuneng-berri deleted the litellm_ci_028866 branch October 31, 2026 19:32
yuneng-berri added a commit that referenced this pull request Nov 7, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants