Skip to content

fix: hermes-compiler path for RN 0.82+ in the hermes bytecode plugin #2167

fix: hermes-compiler path for RN 0.82+ in the hermes bytecode plugin

fix: hermes-compiler path for RN 0.82+ in the hermes bytecode plugin #2167

Re-run triggered February 2, 2026 12:42
Status Failure
Total duration 2m 51s
Artifacts

test.yml

on: pull_request
Matrix: verify
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Verify [Node 24]
Process completed with exit code 1.
Verify [Node 22]
The strategy configuration was canceled because "verify._24_ubuntu-latest" failed
Verify [Node 22]
The operation was canceled.
Verify [Node 18]
The strategy configuration was canceled because "verify._24_ubuntu-latest" failed
Verify [Node 18]
The operation was canceled.
Verify [Node 20]
The strategy configuration was canceled because "verify._24_ubuntu-latest" failed
Verify [Node 20]
The operation was canceled.