Skip to content

- Upgrade ERB dependency to 5.x #31

- Upgrade ERB dependency to 5.x

- Upgrade ERB dependency to 5.x #31

Triggered via push October 14, 2025 07:57
Status Failure
Total duration 19s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Ruby 3.1
The process '/opt/hostedtoolcache/Ruby/3.1.7/x64/bin/bundle' failed with exit code 6
Ruby 3.3
The operation was canceled.
Ruby 3.3
The strategy configuration was canceled because "test._3_1" failed
Ruby 3.2
The operation was canceled.
Ruby 3.2
The strategy configuration was canceled because "test._3_1" failed
Ruby 3.4
The operation was canceled.
Ruby 3.4
The strategy configuration was canceled because "test._3_1" failed